Christmas in Timber Town

Wednesday, April 13, 2011

Recent Developments

The 7 new SSRs are at the halfway point in construction and will soon be assigned jobs. Hopefully, we will have enough Cat5 cable to make the runs out to the yard. Also, a new addition is being made for the front porch, a new 7' revolving, yep, revolving pre-lit tree! As we are sure its not water-proof, it will be standing under cover on the porch. Much better than trying to see it through a window, I'm sure. A new cartoonish reindeer blow-mold will be appearing somewhere out in the yard probably on the side of the house. A lot of light strings acquired that didn't work, have now been repaired and ready for use. Some new scratch-built items are nearing completion as well. Light Fence construction is gearing up and will added to the front yard line. A major portion of the entire Light Show now has put up and away in new storage areas so nothing will get lost or broken. Good to have more garage space back. Plans for the 4Th of July show are being finalized and sequences written (gonna be a good Rock n Roll show for sure!). Plans for the Halloween show are also in the works with all the new items being assigned their places. A lot more things to work on and planning is still going on, so stay tuned!